From: owner-ammf-digest@smoe.org (alt.music.moxy-fruvous digest) To: ammf-digest@smoe.org Subject: alt.music.moxy-fruvous digest V14 #10876 Reply-To: ammf@fruvous.com Sender: owner-ammf-digest@smoe.org Errors-To: owner-ammf-digest@smoe.org Precedence: bulk alt.music.moxy-fruvous digest Thursday, March 9 2023 Volume 14 : Number 10876 Today's Subjects: ----------------- Little Known Way To Bring Nearly ANY Dead Battery Back To Life again.. ["] ---------------------------------------------------------------------- Date: Thu, 9 Mar 2023 16:41:35 +0100 From: "Battery Back to Life" Subject: Little Known Way To Bring Nearly ANY Dead Battery Back To Life again.. Little Known Way To Bring Nearly ANY Dead Battery Back To Life again.. http://batteryrecinditioningcourse.shop/BjyEV4k11LuNag-eUnoxWPVMVaI7osyxmYPZOYgxGW1HMuBU0g http://batteryrecinditioningcourse.shop/DieNSEFBXVog6KkmptH-e6Ncq9BMGt6VwDmxRhyLXeW7Bu0BwA Specifics about the third phase, which initially was to involve renovations to older buildings, long remained undisclosed. In November 2009, plans were made public that LACMA's director Michael Govan was working with Swiss architect and Pritzker Prize laureate Peter Zumthor on plans for rebuilding the eastern section of the campus, the Perreira Buildings between the two new Renzo Piano buildings and the tar pits. Architecture firm Skidmore, Owings & Merrill collaborated with Zumthor on the building's design. With an estimated cost of $650 million, Zumthor's first proposal called for a horizontal building along Wilshire Boulevard. It would have been wrapped in glass on all sides and its main galleries lifted one floor into the air. The wide roof would have been covered with solar panels. In a later concession to concerns raised by its neighbor, the Page Museum, LACMA had Zumthor alter the shape of his proposed building to stretch across Wilshire Boulevard and away from the La Brea Tar Pits. In June 2014, the Los Angeles County Board of Supervisors approved $5 million for LACMA to continue its proposed plans to tear down the structures on the east end of its campus for a single museum building. Later that year, they approved in concept a plan that would provide public financing and $125 million toward the $600-million project. On April 8, 2019, the Zumthor-designed building was approved by the Los Angeles County Board of Supervisors. The final approved building designed was scaled back from the original 387,500 square feet (36,000 m2) to 347,500 square feet (32,280 m2), with gallery space shrinking from 121,000 square feet (11,200 m2) to 110,000 square feet (10,000 m2). The new proposal also dropped the black form aesthetics, reducing it to a one-level, aboveground, glass-enclosed, sand-colored concrete building, to save costs. The design still calls for an arm above Wilshire Boulevard. Other than necessary mechanical systems and bathrooms, the building's entire second story will be devoted to gallery space. Arranged in four broad clusters around the building, each one of the twenty-six core ga ------------------------------ End of alt.music.moxy-fruvous digest V14 #10876 ***********************************************